Main Article Content

Abstract

The development of the construction industry is changing very quickly. This is evidenced by the many construction projects being built in Indonesia, such as buildings, roads, bridges, etc. However, the delay in the development process is still an obstacle that must be resolved, one of which is the delay in the design process, even according to previous research, the delay based on the shop drawing process is 22%. Therefore, how to overcome delays due to the shop drawing process. Can the process of making shop drawings be more efficient? To minimize delays caused by the shop drawing design, the author will conduct research to create designs using drawing applications. By integrating Building Information Modeling (BIM) several image applications which will then be combined with estimation data and project scheduling data. Many of these applications are found on the internet, but the integration applications that I will use include Vico Office for 3D, 4D, and 5D analysis, Sketchup for architectural design, Autodesk Revit for electrical design, Tekla Structure for structural design and SAP 2000 for structure analysis. It can be concluded from this study that time efficiency can be found in making project designs and can minimize delays caused by design and planning by 30% compared to the results of design and planning that do not use the concept of integration of Building Information Modeling (BIM)

Keywords

Building Information Modeling (BIM) Project management Construction engineering Construction resources

Article Details

Author Biographies

Paikun IPM, Universitas Nusa Putra

Construction management, Structural engineering, Material technology, Transportation

Ardin Rozandi, Universitas Nusa Putra

Transportation

Dana Budiman, Universitas Nusa Putra

Civil engineering, Project resources

How to Cite
IPM, P., Rozandi, A., Budiman, D., Indra Ramdani, & Vladimirovna, K. E. (2022). Implementasi Building Information Modeling (BIM) Pada Proyek Perumahan. Jurnal TESLINK : Teknik Sipil Dan Lingkungan, 4(1), 1-15. https://doi.org/10.52005/teslink.v4i1.105

References

  1. [1] T. Kadri and R. D. H. Sugara, “Estimated budget construction housing using linear regression model easy and fast solutions accurate,” in 2017 International Conference on Computing,
  2. Engineering, and Design (ICCED), 2017, pp. 1–6. Available at : Google Scholar
  3. [2] S. Fauzi, C. Suhendi, and L. O. Nelfia, “Perencanaan struktur rangka batang menggunakan metode building information modeling (BIM) dan konvensional,” J. TESLINK Tek. Sipil dan Lingkung., vol. 3, no. 2, pp. 62–73, 2021. Available at : Google Scholar
  4. [3] J. U. D. Hatmoko, M. A. Wibowo, F. Kristiani, R. R. Khasani, R. Fatmawati, and G. D. Sihaloho, “EDUKASI BUILDING INFORMATION MODELING (BIM) PADA KONTRAKTOR KECIL,” J. Pasopati Pengabdi. Masy. dan Inov. Pengemb. Teknol., vol. 2, no. 3, 2020. Available at : Google Scholar
  5. [4] A. Huqban and C. Suhendi, “Analisis Keterlambatan Penyediaan Material Terhadap Ketepatan Waktu Pembangunan,” J. TESLINK Tek. Sipil dan Lingkung., vol. 2, no. 1, pp. 35–43, 2020.
  6. Available at : Google Scholar
  7. [5] N. S. Nugroho, “Construction Time Determination Model, Automatically Detected Resource Needs Using Programs,” Int. J. Innov. Technol. Explor. Eng., vol. 9, no. 9, pp. 161–171, 2020, doi: 10.35940/ijitee.i7036.079920. Available at : IJITEE
  8. [6] D. F. Paikun, S. M. Sholihah, U. Faisal, and T. Kadri, “Conceptual Estimation of Cost Significant Model on Shop-Houses Construction,” 2019. Available at : Google Scholar
  9. [7] A. Aprilia, M. R. Siddiq, R. E. Hamdani, N. S. Nugroho, and J. Jasmansyah, “Regression Model of Shop-house Construction Costs and Percentage of Building Component Costs,” in 2019 5th International Conference on Computing Engineering and Design (ICCED), 2019, pp. 1–6. Available at : Google Scholar
  10. [8] R. Minawati, H. P. Chandra, and P. Nugraha, “Manfaat Penggunaan Software Tekla Building Information Modeling (Bim) Pada Proyek Design-Build,” Dimens. Utama Tek. Sipil, vol. 4, no. 2, pp. 8–15, 2017. Available at : Google Scholar
  11. [9] M. S. Alshabab, A. Vysotskiy, M. Petrichenko, and T. Khalil, “BIM-Based Quantity Takeoff in Autodesk Revit and Navisworks Manage,” Proc. EECE 2019 Energy, Environ. Constr. Eng., vol. 70,
  12. p. 413, 2020. Available at : Google Scholar
  13. [10] A. S. Sastraatmadja, “Analisa (cara modern) Anggaran Biaya Pelaksanaan,” Nova. Jakarta, p. 1, 2002. Available at : Google Scholar
  14. [11] D. Olsen and J. M. Taylor, “Quantity take-off using building information modeling (BIM), and its limiting factors,” Procedia Eng., vol. 196, pp. 1098–1105, 2017. Available at : Google Scholar
  15. [12] M. S. Alshabab, A. E. Vysotskiy, T. Khalil, and M. V Petrochenko, “BIM-based quantity takeoff,” Stroit. Unikal’nyh Zdanij i Sooruz., no. 4, p. 124, 2017. Available at : Google Scholar
  16. [13] H. Mattern, M. Scheffer, and M. König, “BIM-based quantity take-off,” Build. Inf. Model. Technol. Found. Ind. Pract., vol. 4, no. 55, pp. 383–391, 2018, doi: 10.1007/978-3-319-92862-3_23.
  17. Available at : Google Scholar
  18. [14] L. I. Septiliandri, “PERENCANAAN HOTEL 7 LANTAI BERBASIS METODE BUILDING INFORMATION MODELLING MENGGUNAKAN SOFTWARE TEKLA STRUCTURES DAN TEKLA STRUCTURAL DESIGNER.” Universitas 17 Agustus 1945 Surabaya, 2021. Available at :
  19. Google Scholar
  20. [15] B. W. Soemardi, “Studi Aplikasi Teknologi Building InformationModeling untuk Pra Konstruksi,” 2014. Available at : Google Scholar
  21. [16] A. T. Baskoro, “Peran building information modeling (bim) dalam pengendalian biaya pada pelaksanaan proyek konstruksi bangunan gedung.” Universitas Pelita Harapan, 2021. Available at : Google Scholar
  22. [17] A. Suwarni and B. Anondho, “Perbandingan Perhitungan Volume Kolom Beton Antara Building Information Modeling (Bim) Dengan Metode Konvensional,” JUTEKS J. Tek. Sipil, vol. 6, no. 2, pp. 75–83, 2021. Available at : Google Scholar
  23. [18] Y. Raflis and B. Endro, “Manfaat penggunaan Building Information Modelling (BIM) pada proyek konstruksi sebagai media komunikasi stakeholders,” Constr. Eng. Sustain. Dev., vol. 1, no. 02, 2018. Available at : Google Scholar
  24. [19] R. APRIANSYAH, “Implementasi Konsep Building Information Modelling (BIM) Dalam Estimasi Quantity Take Off Material Pekerjaan Struktural,” 2021. Available at : Google Scholar
  25. [20] R. Rayshanda, “Manfaat Penggunaan Building Information Modelling (BIM) Pada Proyek Konstruksi Sebagai Media Komunikasi Stakeholders,” Indones. J. Constr. Eng. Sustain. Dev., vol. 1, no. 2, pp. 62–66, 2019. Available at : Google Scholar
  26. [21] I. K. Octavia, E. C. Tandoyo, P. Nugraha, and S. Lukito, “Perbandingan Aplikasi Program Microsoft Project dan Primavera dalam Penjadwalan Proyek Konstruksi,” J. Dimens. Pratama Tek. Sipil, vol. 2, no. 2, 2013. Available at : Google Scholar